A HUGE PROJECT

SHELL is going to install off the Australian coast the largest floating facility ever built – the Prelude Floating Liquefied Natural Gas (FLNG) facility – at 488m long!

METRAVIB Engineering teams worked in tight collaboration with TECHNIP to include vibration criteria from the design stage. More specifically METRAVIB conducted the analysis of all structures and surface facilities (topsides) of that huge platform.

The corresponding recommendations will ensure working conditions compliant with HSE standards.

For more information about METRAVIB engineering solutions, please contact us.